| |
Project: Princess of Wales CAMHS Unit
Sector: Health
Client: Abertawe Bro Morganwwg
Main Contractor: BAM Construction
Electrical Contractor: Lorne Stewart PLC |
|
Project Description:
SGD Security Ltdand ADC Fire Systems Ltdhave been appointed as the fire and security specialist contractor for the purpose built CAHMS unit and the Princess of Wales Hospital Bridgend.
SGD Security Ltd has been employed to provide a custom designed, fully networked25+ door access control system.The site will also benefit from Bosch CCTV which will be integrated to the existing site system.
ADC Fire Systems Ltdare involved with the system design, supply, installation and commission of the fully addressable fire detection system consisting of 5 loops and integration to a building paging system as well as the site wide fire and security network.The site will also have a multistation disabled refuge system. |